---
{
  "id": "NOTE-001",
  "type": "note",
  "title": "Permission can outlast an opportunity to intervene",
  "summary": "A useful research question is whether an authorisation remains active after meaningful human intervention becomes difficult.",
  "date": "2026-10-03",
  "tags": [
    "permissions",
    "human-oversight",
    "observability",
    "delegation"
  ]
}
---

## Exploratory proposition
The scope of permission and the practical opportunity to intervene should be examined together. A formal right to stop an activity may be difficult to use if the human cannot detect a problem before effects spread.

## What would test this?
Describe a concrete sequence: instruction, permission, action, observation, intervention and downstream effect. Locate the last point at which intervention could change the outcome.

## What would weaken the proposition?
Look for arrangements where broad standing permission is paired with effective rollback or a deliberately bounded action environment. Permission scope alone would then explain little about practical control.

## Provenance
This note is illustrative working reasoning for the initial site. It is not an empirical finding or a claim attributed to an external author.

## Connections
[[CON-002]] asks what humans can reconstruct. [[ESS-001]] sketches a possible longer investigation.
